After several years of minimal operation and no maintenance, our client elected to upgrade and restart a uranium mine facility. PSE was prominent in this effort and contributed heavily in the three main components of the upgrade: the modification of the existing uranium mill, the mitigation of vanadium dust/fumes, and the design of an alternative feedstock processing system.
Services Provided:
Controls Engineering:
- Drum Dump Machine
Electrical Engineering:
- Motor Control Center
Mechanical Engineering:
- Tank replacement
- Equipment design
Civil Engineering:
- Containment design
- Re-design of dust/fume exhaust system
- Implemented New Scrubber
- Electrical Schematics
- Wiring Diagrams
- Instrumentation Specification and Purchasing
- Lighting and Grounding Design Drawings
- Piping & Instrumentation Diagrams (P&IDs)
- Operating and Interlock Description
- Automated PLC Controls with HMI Calibration and Field Check-Out
PROJECT MANAGEMENT:
- Managed scope, schedule and budget
- Handled all document control
- Review and Evaluation of Vendor Proposals
Construction Phase:
- Tank Specifications and RFQs
- Construction Management
Ženy mohou špatně pochopit funkci Ženská Viagra 100mg růžové pilulky a zaměnit její účinky za tu pánskou. Žádný z nich se nikdy neocitl v takto luxusním prostředí. Dobrý den, nevím kde začít, přítel od moje-lekarna.com té doby co jsme spolu moc.