Uranium Mill Upgrades

After several years of minimal operation and no maintenance, our client elected to upgrade and restart a uranium mine facility. PSE was prominent in this effort and contributed heavily in the three main components of the upgrade: the modification of the existing uranium mill, the mitigation of vanadium dust/fumes, and the design of an alternative feedstock processing system.

Services Provided:

Controls Engineering:

  • Drum Dump Machine

Electrical Engineering:

  • Motor Control Center

Mechanical Engineering:

  • Tank replacement
  • Equipment design

Civil Engineering:

  • Containment design
  • Re-design of dust/fume exhaust system
  • Implemented New Scrubber
  • Electrical Schematics
  • Wiring Diagrams
  • Instrumentation Specification and Purchasing
  • Lighting and Grounding Design Drawings
  • Piping & Instrumentation Diagrams (P&IDs)
  • Operating and Interlock Description
  • Automated PLC Controls with HMI Calibration and Field Check-Out

PROJECT MANAGEMENT:

  • Managed scope, schedule and budget
  • Handled all document control
  • Review and Evaluation of Vendor Proposals

Construction Phase:

  • Tank Specifications and RFQs
  • Construction Management

Ženy mohou špatně pochopit funkci Ženská Viagra 100mg růžové pilulky a zaměnit její účinky za tu pánskou. Žádný z nich se nikdy neocitl v takto luxusním prostředí. Dobrý den, nevím kde začít, přítel od moje-lekarna.com té doby co jsme spolu moc.