PSE provided engineering for the Utah/Nevada gasoline pipeline connection to gain access to the Las Vegas market. Project included tanks, pumps, pipeline, extensive leak detection systems, foundations for pumps and pig launchers/pig receivers, pipe structures, access platforms, civil site work, civil/structural work for transfer stations, as well as miscellaneous buildings such as the MCC enclosure.
MULTI-DISCIPLINE SERVICES USED:
Engineering Analysis – PSE to provide:
Pipeline
- Hydraulic study, electrical load analysis, sizing calculations for all engineered equipment and piping:
- Pumps
- Transformer/Electrical Equipment
- Piping
- Pig launcher/receiver
- Relief valves required for the pump or pig launcher and receiver
- New 10”, 300# pipeline
- Pig launcher – installed at the Remote Tank Farm
- Spill containment under the pig launcher
- Pig Receiver – installed at the UNEV Pump Station
- Spill containment under the pig receiver
- Pump Skid – installed at the Remote Tank Farm
- Corrosion Protection
- Lighting
- Provide a method to cathodically protect the buried pipeline
- Provide lighting at the Tesoro Remote Tank Farm for
- The pump skid
- The pig launcher
- Provide lighting at the UNEV Station for The pig receiver