PSE performed engineering and design services for several miles of a natural gas pipeline in Salt Lake County, Utah. The scope of the project was preliminary engineering and design services including cost estimating.
Multi-Discipline Services:
- Assessments of Alignment Options
- Process Flow Diagram
- General Arrangement Drawings
- Relief Valve Engineering
- Control Valve Engineering
- Flow Meter Engineering
- Instrumentation Engineering and Design
- Material Take Off
- Total Installed Cost Estimate