PSE provided engineering services ranging from a feasibility study through detailed design of a 1,900 bpd isomerization unit for Silver Eagle’s refinery at Woods Cross, Utah. To complete the project, PSE personnel began by examining an existing Silver Eagle isomerization unit, and made site-specific modifications to enhance.
MULTI-DISCIPLINE SERVICES USED:
Process Engineering:
- Feasibility study
- Process flow diagram
- Process simulations
- Design of new tower
- Modifications to heat and material balances
Mechanical Engineering:
- Development of P&IDs
- Piping design (on-site)
- Isometric drawings
Structural Engineering:
- Structural pipe support design
- Vessel support design
Civil/Environmental Engineering:
- Design of 40’ x 40’ x 5’ mat foundation
- Excavation and replacement of 8’ of soil w/ engineered fill
Construction Phase:
- Construction cost estimate
- On-site construction management support