Recycling Plant – Lathrop, CA

This project was a plant upgrade and expansion that included the addition of an aerator and aeration basin, expansion of a pump station, upgrade of electrical and controls systems and modifications to existing headworks and distribution facilities. The PSE scope of work included the following:

MULTIDISCIPLINE CONSULTING SERVICES USED:

MECHANICAL ENGINEERING:

  • Pump sizing and selection
  • Piping engineering and design
  • Equipment specifications

CIVIL/ENVIRONMENTAL ENGINEERING:

  • Aeration basin engineering and design
  • Pump station modifications engineering and design
  • Retaining structures
  • Site layout and grading plan

CONSTRUCTION PHASE:

  • Engineering support during construction
  • Startup and commissioning

ELECTRICAL ENGINEERING:

  • Electrical Schematics
  • Wiring Diagrams
  • Motor Control Center
  • Instrumentation Specification and Purchasing Physical Layout Drawings
  • Lighting and Grounding Design Drawings
  • Piping & Instrumentation Diagrams
  • Operating and Interlock Description
  • SCADA System engineering and design