White Mesa Uranium Mill Upgrades

After several years of minimal operation and no maintenance, Denison Mines elected to upgrade and restart the White Mesa facility. Precision Systems Engineering was contracted to assist with three main components of the upgrade: the modification of the existing uranium mill, the mitigation of vanadium dust/fumes, and the design of an alternative feedstock processing system.

MULTIDISCIPLINE CONSULTING SERVICES PROVIDED:

MECHANICAL ENGINEERING:

  • Replacement of Uranium Circuit Clarifier and Raffinate Tanks
  • Replacement of Uranium and Vanadium Solvent Extraction Tanks
  • Design of Tanks, Pumps, Conveyors, Filter Presses, Agitators and Steam Sparging for Feedstock Process

CIVIL/ENVIRONMENTAL ENGINEERING:

  • Design of Sodium Chlorate Containment
  • Design of Solvent Extraction and Raffinate Tank Containment
  • Re-design of Vanadium Fume Exhaust System
  • Implemented New Scrubber for External Exhaust at Vanadium Facility

CONSTRUCTION PHASE:

  • Preparation of Tank Specifications and RFQ
  • Review and Evaluation of Vendor Proposals
  • Construction Management

ELECTRICAL ENGINEERING:

  • Electrical Schematics
  • Wiring Diagrams
  • Motor Control Center
  • Instrumentation Specification and Purchasing Physical Layout Drawings
  • Lighting and Grounding Design Drawings
  • Piping & Instrumentation Diagrams
  • Operating and Interlock Description
  • Automated PLC Controls with HMI Calibration and Field Check-Out
  • Start-Up Construction Management

CONTROLS ENGINEERING:

  • Drum Dump Machine