Orange Juice Concentrate Storage

PSE personnel were contracted as project management for this design/build expansion of the Sunkist Growers’ existing cold storage facility. This challenging project included analyzing the existing facility without the benefit of existing engineering documentation. It also involved sequencing the construction process to avoid interrupting the existing production processes. This was all accomplished while working in a -10°F environment.

TURNKEY CONSULTING SERVICES APPLIED IN THIS PROJECT:

Process Engineering:

  • Piping and instrumentation diagrams (P&IDs)

Controls Design:

  • Developed sequence of operation
  • Designed instrumentation and programming

Mechanical Engineering:

  • General arrangement drawings
  • Specifications for silos, pumps, and valves

Structural Engineering:

  • Design of circular tank foundations
  • Design of piping racks

Electrical Engineering:

  • Specifications for MCC
  • Single-line drawings
  • Valve wiring drawings

Construction Phase:

  • Procurement
  • Construction management
  • Startup and validation